0
HPPs total installed capacity (MW)
0
gPower total installed capacity (MW)
0
HPPs - generated electricity in 2023 (MW/hrs)
0
gPower - generated electricity in 2023 (MW/hrs)

About Us

Energo-Pro Group entered the energy market of Georgia in 2006. As a result of the energy market reform in Georgia, within the framework of the „Energy Community“ agreement, on the basis of the „Third Energy Package“ (that Generation and Distribution companies should not be under common ownership and should be divided), JSC „Energo-Pro Georgia Generation“ was established in 2016 as a result of the distribution of the company and the division of generation assets.

News

საქართველოს ენეგეტიკულ ბირჟაზე პირველი წარმატებული გარიგება განხორციელდა.  სს ,,ეპ ჯორჯია გენერაციამ“ ბირჟაზე ელექტროენერგია გაყიდა.

24.07.2024

Power Plants